Library
Regulatory filings and other documents will be posted here:
- Public Route Permit Application-Fargo to Alexandria Second Circuit 345 kV Transmission Line Project
- Route Permit Amendment (to be filed in late 2025)
- LRTP2 Certificate of Need Application (to be filed in late 2025)
To subscribe to the project’s dockets (Certificate of Need and/or Route Permit) and to receive email notifications when information is filed in the dockets visit the how-to here: https://mn.gov/puc/edockets/how-to/. If you don’t want to create an account click here to subscribe: https://www.edockets.state.mn.us/subscriptions/verify. The Certificate of Need docket # is “25-116”.